- SSTV (Kenwood D710E) – STATUS - Planned activation. Default mode is for scheduled SSTV operations (145.800 MHz down) using PD 120.
- Planned installation and activation on Oct 8 about 14:15-16:00 UTC.
- Continuous operation from activation until Oct 11 about 07:25 UTC (to support school contacts that day).
- Reactivation Oct 11 about 14:50 and continuous operation until Oct 14 about 14:20 UTC.
- Specifically configured for SSTV ops.
- Currently capable of ONLY supporting ROS scheduled voice contacts and SSTV ops.
- Future updates to be provided at https://www.ariss.org/current-status-of-iss-stations.html